| DavidS |
03-27-2016 08:33 PM |
Quote:
Originally Posted by smokinss
(Post 90970)
The GTO is coming along!!!!
Thanks David! That's easily 2-3 days of work. No problem with that! Looking forward to getting together with everyone!
|
SmokinSS..... sorry for the delay, but I've had a contractor that is a slow as heck redoing the guest room bathroom. He's been working on it since December and works about 2 to 3 hours a and works 4 or 5 days per week. It's taking him a very long time, but he does nice work.
As soon as he's done, I'd like to have you over.
I'm not sure if Dawg will join in, but at a minimum I have 3 vehicles for you. The Silverado, the CTS, and the 68.
|